Husky 48WC01BP-THD Bedienerhandbuch Seite 6

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 5
OPTION 1
HUSKY® TRACKWALL INSTALLATION
Items Needed:
BB - 1/4-20 x 3/4in Button Head Screw (Qty: 4)
DD - 1/4-20 Flange Nut (Qty: 4)
RR - Bracket - Wall
J - Hanger Bracket
Process:
Option 1 is for hanging the cabinet on Husky® Trackwall
only. If hanging cabinet directly on wall go to Option 2.
Attach J bracket, as shown using, (4) BB screws and
(4) DD nuts.
• Finger tighten.
Remove the two BB screws and DD nuts from the center
of the unit.
Place RR on the back of the unit and secure with the BB
screws and DD nuts removed earlier.
• Finger tighten.
SQUARE THE CABINET
• Square the cabinet and wrench tighten all bolts.
NOTE: be sure all hardware is fully seated
before tightening.
Process:
Place G panel overlapping H panel and secure the top
and bottom outside corners with square mounting holes
with (2) AA bolts, (2) CC washers, and (2) DD nuts.
Finish securing G to H with (3) BB screws and
(3) DD nuts.
• Finger tighten.
• Repeat for other side
ATTACH BACK OUTER PANELS
Items Needed:
G - Back Outer (Qty: 2)
AA - 1/4-20 x 5/8in Carriage Bolt (Qty: 4)
BB - 1/4-20 x 3/4in Button Head Screw (Qty: 6)
CC - 5/16in Washer (Qty: 4)
DD - 1/4-20 Flange Nut (Qty: 10)
6
Figure 7
AA
BB
BB
RR
J
DD
Step 7 Result
Figure 9
Step 9 Option 1 Result
G
DD
CC
Seitenansicht 5
1 2 3 4 5 6 7 8 9 10 11 ... 23 24

Kommentare zu diesen Handbüchern

Keine Kommentare