Process:
• Place the grommets JJ in the holes in D and G.
JJ
Items Needed:
JJ - Grommet (Qty: 2)
8
OPERATION
Process:
• Align Wall Cabinet with studs.
• Mark and drill (2) 1/8-in pilot holes. Note Use outside
holes for mounting to studs on 24-in centers. Use inside
set of holes for mounting to studs on 16-in centers.
• Attach Wall Cabinet to studs using appropriate hardware
as dened by your local building code.
SHELF ADJUSTMENT
• Empty shelf.
• Remove fasteners.
• Rotate shelf upward and pull forward, as shown.
• Move shelf to desired location.
• Insert back of shelf in notches, rotate shelf into place
and reinstall fasteners.
16-in centers
24-in centers
Figure 14
FINAL MOUNTING OPTION 2
LOCKING AND UNLOCKING THE UNIT
Items Needed:
Mounting hardware as dened by your local building
code.
Locking the Unit:
• Make sure doors are fully closed.
• Insert the key and turn fully to the left.
• Remove key.
Unlocking the Unit:
• Insert the key and turn fully to the right.
• Remove key.
Process:
Note: Option 1 is for hanging cabinet on Husky®
Trackwall. If hanging cabinet directly on wall,
go to option 2.
• With assistance hook bracket H over Trackwall and
slide down into place.
Note: Unit cannot be placed over a Joiner Section of
Trackwall. Unit must be hung either left or right of the
Joiner and then slid over the joiner.
Hook over Trackwall and
slide down into place.
Figure 13
FINAL MOUNTING OPTION 1
Bracket-Wall
GROMMET INSTALLATION